Residential Power Installations

Our company is presently (Spring and Summer, 2018) working in the implementation of the electrification network of a touristic resort in Tale, Albania.


We are connecting the new resort with the 20kV (MV power network) via underground 3-phase cable, supplying and connecting three 630kVA dry transformers (20/0.4kV), and laying out the LV cable grid which supplies the separate villa buildings of the resort.