Name of Employer: Albanian Power Corporation.
Design, planning, supply, construction, connection with the grid at 110kV transmission line, and testing of Sukth substation with one 25MVA transformer. Delivered turnkey in June 2006 to the Albanian Power Corporation, fully accepted after their commissioning.